



SINSAY shop – the change of location of the steel structure support over the shop window, improvement of the structure of the shop window, reconstruction the support frame, a G-K plate together with the grounding in a new location;
RESERVED shop – dismantling of a steel pier and assembly of piers, dismantling of a water supply connection.